Jump to content
bernardperu

LH Labs by Larry Ho. No delivery since 2014

Rate this topic

Recommended Posts

10 minutes ago, LHCommSquad said:

I'm dying. Extremely accurate.

 

Absolutely no offense to Chris, but he's kind of shown himself to be not 100% neutral on the matter. On top of that, I don't think it would ever happen regardless of whether it was Chris or not, but I'll pass that idea along. I personally think it's great. I've been pushing for more Q&As myself actually, either live or via updates.

How about Larry and Steve Bannon having a chat hosted by Alex Jones?

Share this post


Link to post
Share on other sites
1 hour ago, mansr said:

Then, clearly, you are someone hired by Larry to do damage control. Here's a hint: it ain't working.

 

are you saying he is really Scroggie??

Share this post


Link to post
Share on other sites
1 minute ago, EdmontonCanuck said:

Humor aside, I'd be interested in hearing a response about some sort of Q&A from Larry. I think that if he declined it would speak volumes.

 Could also mean he doesn't want to put himself out there where everyone would just call him a liar regardless. Maybe both. It's easy to speculate both ways with zero proof of intentions either way. If i hear something, I'll announce it. 

Share this post


Link to post
Share on other sites
1 minute ago, LHCommSquad said:

 Could also mean he doesn't want to put himself out there where everyone would just call him a liar regardless. Maybe both. It's easy to speculate both ways with zero proof of intentions either way. If i hear something, I'll announce it. 

 

Being a communications guy, I'm sure you could present him with sound arguments as to why it might be a good idea, given the current state of affairs.

Share this post


Link to post
Share on other sites
On 2/4/2019 at 4:25 AM, marflao said:

alright...here we go.

 

Sheet has been created: 

https://docs.google.com/spreadsheets/d/1vE7_LByDDY6w8J-E-l4njfkvXcggTasrG90z11swJww/edit?usp=sharing

 

In case you want to be part of this sheet pls send me an email to defraudedbylhl at gmail dot com with the following  details:

- username (as mentioned.. it is hidden)

- "your" forum where you use the username

- from which continent you are

- which LHL device(s) you have backed and

- how much you paid for each backed device.

 

Cheers,

M.

 

 

 

 

Bumping this post so as not to get lost. Send your info people.

Share this post


Link to post
Share on other sites

I asked Lee if he would be willing to moderate the Q&A Discussion with Larry, assuming it gets approved. If Lee responds and agrees, we'll hammer out the next steps and announce that. Barring that....we hopefully will be able to figure something else out.

Share this post


Link to post
Share on other sites
1 hour ago, PorkChop said:

@bernardperu, it would be great if you can update the title of your post to reflect the current wait for Geek Wave, which has now been about 4.3 years.

 

I tried for several minutes to change the title of the forum to "LH Labs by Larry Ho. No deliver since 2014." How do I change the title?

 

Thanks!

Share this post


Link to post
Share on other sites
4 hours ago, mansr said:

What conversation?

I wondered also. Jarek has never had a conversation that I've seen or heard and neither has Larry (besides years ago when he'd do an occasional video interview with Gavin to show us how close he was to finishing his design for this that and the other thing - all of which are still nowhere to be found).

Share this post


Link to post
Share on other sites

All of us who paid over 3k for the Vi DAC haven't had an update for 5 months and that update had lots of vague detail that should warrant an update by now plus a LOT of answered but obvious questions: It indicated 10 chassis on the way and two factories "supplying Vi DAC Chassis" and yet no update since. What happened to the 10? What's going on with the two factories? Are the boards done? The CCX modules?  Who will assemble and when? Why is it an open question, whether or not "we will need to make more original Vi Chassis"?

Vi DAC 9/5/18

Modified on: Tue, 4 Sep, 2018 at 11:49 PM


Hey everyone, 

 

We have two factories right now supplying Vi DAC chassis units. The original is sending out 10 more original designed version of chassis.

 

 We have the new Vi chassis design ready, and we are letting the new factory make those units. We will post the photo of the new chassis once we receive it. It should be in three weeks. If no problems are present, then we will start the full speed production of the new version of the chassis. We will also confirm the remaining Vi DAC backers' shipping addresses again. 

 

As mentioned, we are using two factories now. The new one is the one which has tons of good experience with other hi-end gear. The original Vi DAC chassis factory will just deliver the remaining order and we will put them in idle unless we will need to make more original Vi Chassis.

 

Again, thank you for your patience in this campaign. 

 

The entire LHL team. 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×